For over 30 years, MNEC Consultants Pvt. Ltd. has been dedicated to the timely and precise delivery of a myriad of complex projects to our diverse clientele. This commitment has not only fostered numerous relationships and partnerships but has also led to the achievement of significant landmarks and milestones along the way.
Transmission Line Survey Work Executed
PMC Projects Executed
Road Survey (IE, DPR, etc.) Work Executed
Pipeline Survey Work Executed
City Gas Distribution Network
Surveys Executed
Geotechnical Investigation Executed
Agricultural Soil Samples Tested for Nutrient & Micro-nutrient Testing
Topographic Survey Work Executed
FLS Survey for Railway Projects Executed
DGPS Control Survey Work Executed
PDI Survey for Gas Pipelines Work Executed
Canal Alignment Survey Work Executed
Command Area Survey
Mining Block DGPS Survey
Cadastral Survey
Reconnaissance Survey
Land Acquisition Survey for Pipelines
Project Management Consultancy Services
Soil Survey
GIS for Pipelines & Transmission Lines
EIA/EMP Report Preparation
Monitoring Environmental Parameter
Forest Clearance
Supply of Engineering & Personnel Manpower for Supervision & Monitoring at Polavaram Irrigation Project.
Survey of entire route for the Mumbai-Ahmedabad High Speed Railway. India's first Bullet Train
Survey of Natural Gas Pipeline of over 2600 km length.
Geo-Technical Investigation for BARC Research Facility in Andhra Pradesh.
Survey & allied services for construction of gated barrage on Kanhar river.
Mapping of costal zone of India for SOI under ICZM project for an area of 18705 sq. km in multiple states.
Designing and allied services for construction xxx km long tunnel of river water diversion of river water
Survey for establishment of National Waterway-5
Construction of 400 kV power transmission line in sectors including snow cover and hilly terrain.
Supply of Engineering & Personnel Manpower for Supervision & Monitoring of construction of dam & canal network.
Survey & Allied services for allocation of 55 sand mines in Ujjain district
Bi-Annual rate contract for over 275 km of survey and allied services.
FLS survey of 270 km BG Line and isolated sections.
IE services for upgradation works for highways under flagship Hybrid Annuity Model. 8 packages executed for total of 550km.
Investigation services for construction of phase-II 800 MW power plant
Survey and allied services for construction of xxx km crude pipeline from Kandla port to Viragram
Survey work for construction of India's first floating power plant at Getalsud dam
Supply of over 5 lakh rubber plants for development of rubber plantations in North East India.
Water sampling and testing of total drinking water sources in district. Over xxx samples tested.
Survey & Survey report preparation of over 4500 km transmission lines and sub-stations in Nagpur & Amravati division.
Chemical testing of agricultural soil for preparation of soil health cards. Over 5 Lakh samples tested.